Archive for March, 2001

Some tiles have been set in the bathroom, along with most of the drywall and backerboard. The bedrooms have their drywall hung, some of it is taped.

Almost all of the drywall has been hung in the bedrooms.

Durock is installed. Tile layout is decided.


You are currently browsing the Peter Mackay weblog archives for March, 2001.

Longer entries are truncated. Click the headline of an entry to read it in its entirety.